Supply the whole operation.
New generation must cover computing, cooling and supporting equipment. Buying annual energy credits or reallocating supply already serving Islanders would not qualify.
AI data centres • A proposal for Charlottetown
Charlottetown should put firm rules in place before considering a major AI data centre. Any project must supply its own dependable electricity, contribute power to the Island, and use no local water for cooling.
A moratorium until the safeguards are in place. Approval only when every requirement is met.
Meet the facility’s full demand with additional, dependable supply.
Commit a defined, dependable share of power for other Islanders.
No process wells. No evaporative cooling. No draw on our drinking water for cooling.
The developer pays the project’s infrastructure costs.
The starting point
Homes, businesses and public services need reliable electricity and water. A major new computing facility must demonstrate how it will protect those services before it can proceed.
Maritime Electric reports a 300 MW firm electricity import limit and a January 2026 peak demand of 404 MW. Those figures underline why dependable supply matters—not simply the rated capacity of the cables.
Conditions for consideration
New generation must cover computing, cooling and supporting equipment. Buying annual energy credits or reallocating supply already serving Islanders would not qualify.
A binding export commitment must benefit PEI’s grid when power is needed. Occasional surplus electricity is not enough.
Use sealed cooling with dry heat rejection or an equivalent water-saving design. No process wells or evaporative cooling, including in hot weather.
The developer pays attributable generation, connections, grid upgrades and municipal servicing costs, with protection against costs being left behind if the project closes.
Independent assessment of noise, emissions, fuel storage, fire risks and stormwater. Private generation must meet the rules for its actual operating use.
Independent review before approval, certification before operation, public reporting and enforceable consequences for non-compliance.
A benefit we can measure
The discussion framework proposes dependable net export capacity equal to at least 20% of the facility’s approved total electrical demand.
The final requirement would be set after engineering and regulatory review. Export terms must identify how much power is available, when it can be called on and how delivery is verified.
If private generation fails, the operator must have an approved backup and load-reduction plan. It cannot simply assume the public grid will carry its full load.
Protect the water supply
The rule must cover the entire cooling system and associated generation—not just the pipes inside the server room.
Microsoft describes data-centre designs that recirculate cooling liquid without evaporating water. The design must also account for its electricity requirements.
Every proposed project would still need independent verification of its actual cooling system.
Read Microsoft’s cooling overviewQuestions and answers
No. It is a proposed moratorium on new AI data centres until enforceable safeguards exist, followed by strict conditions for any covered development. It does not restrict residents or businesses from using AI tools.
The framework excludes ordinary office computing and small incidental server rooms. Definitions would address dedicated computing facilities and major installations according to their actual use and resource demands, including related phases.
No municipal requirement for two routes is proposed. Physically diverse connections are a sound engineering and commercial practice. Connectivity is the operator’s responsibility, subject to applicable telecommunications law.
The City would use its lawful planning and servicing powers and seek provincial enabling measures where needed. Electricity connections, exports and pricing also require the appropriate utility and regulatory arrangements. A Council motion alone would not suspend existing legal rights.
Employment and tax benefits deserve scrutiny, but they would not replace the mandatory electricity, water, environmental or public-cost safeguards.
This policy is not an allegation about the Atlantic Technology Centre, its tenants or any identified project. It sets out the conditions Daniel proposes for future AI data-centre development in Charlottetown.